Energy logistics Human-approved decisions
Jalani Control Tower
Fuel supply intelligence that proposes a plan and waits for a person to approve it—with a fallback path when conditions change.
BUP CSE Fest 2026 Top 10 Finalist
The problem
Fuel distribution is a scheduling problem where being wrong is expensive and being wrong quietly is worse. Decisions are made against shifting demand and supply conditions, and the consequences of a bad call are physical rather than recoverable.
What we built
Cortex Crew built a control-tower view over fuel supply operations: the platform surfaces the state of the network, proposes a course of action, and routes that proposal to a person for approval rather than acting on it. When conditions change against the plan, there is a defined fallback path instead of an unhandled state.
The platform is simulation-only. It was built and demonstrated against simulated conditions, and it is not connected to live fuel infrastructure.
The engineering decision
Human approval is a structural property here, not a confirmation dialog bolted on at the end. The system is designed around the assumption that the operator is accountable for the decision, so the platform's job is to make the decision well-evidenced and fast — not to make it alone.
The fallback path exists for the same reason. An automated plan that has no defined behaviour when its assumptions break is not actually an operational tool.
Result
Jalani Control Tower placed in the Top 10 at the BUP CSE Fest 2026 Hackathon, hosted by Bangladesh University of Professionals.